April 2022
By Katlego Baakile
 katlego@hydrocon.org


Fast Facts                                                      

 MAUN OFFICE CONTACTS AND LOCATION

Call: +267 6840259

Email: John Wilson: john@hydrocon.org

Email: Boitumelo Lebaleng: boitumelo@hydrocon.org

Open Monday – Friday: 08:00 AM – 05:00 PM


Dam Levels  

Dam Levels as of 25.04.2023                             

Dam

Current Level (%)

25.04.23

Last year’s level (%)

25.04.22

Months of Supply without Inflow

 

Dikgatlhong 96.2 87.5 24
Molatedi 66.5 44.2 60
Gaborone 69.2 55.9 24
Letsibogo 91.3 95.5 23
Thune 77.1 76.7 39
Shashe 93.0 96.2 22
Ntimbale 95.5 99.1 15
Lotsane 56.1 73.4 21
Bokaa 93.2 100 13
Nnywane 96.5 100 13

 

 Total Dam Capacities

Source: Water Utilities Corporation


Projects 

RECENT SOLAR PROJECT IN PICTURES 

Hydrocon Green recently supplied and installed a 9kWp system comprising of 24 solar panels, a 12kW inverter, 15kW battery backup system in Gaborone.

      


Products & Services

 BOREHOLE EQUIPPING

1. Solar Boreholes
2. Electric Boreholes
3. Generator Borehole

Submersible Pump Specifications
Head 15m to 220m, Flow Rate 2m3/Hr to 18m3/Hr

Submersible Motor Specifications
0.37kW to 7.5kW Single Phase and Three phase

   


Rainfall 

Weather Forecast from 24 March – 01 April 2023 – Gaborone

Hydrocon Green Maun Office

  +267 6840259
  John Wilson: john@hydrocon.org
Boitumelo Lebaleng: boitumelo@hydrocon.org