November 2023
By Katlego Baakile
 katlego@hydrocon.org


Fast Facts                                                      

FESTIVE SHUTDOWN

As we approach the festive season, we express our sincere gratitude for your unwavering support throughout the year. As we eagerly anticipate the upcoming holidays, we would like to inform you that Hydrocon offices will be closed from the 22nd of December to the 7th of January 2024.

We are truly thankful for the trust you’ve placed in us, and we look forward to continuing our successful collaboration in the coming year.

May your festive season be filled with joy, warmth, and cherished moments with your loved ones. From the Hydrocon family to yours, we wish you a delightful and safe holiday season. See you in 2024!


Dam Levels  

Dam Levels as of 23.10.2023                             

Dam

Current Level (%)

23.10.23

Last year’s level (%)

23.10.22

Months of Supply without Inflow

 

Dikgatlhong 86.3 75.9 24
Molatedi 53.9 36.4 54
Gaborone 57.1 43.5 21
Letsibogo 67.4 79.6 18
Thune 65.0 65.6 39
Shashe 76.3 72.4 20
Ntimbale 76.5 79.4 15
Lotsane 38.9 55.0 16
Bokaa 70.5 68.1 11
Nnywane 81.1 85.5 11

 

 Total Dam Capacities

Source: Water Utilities Corporation


FESTIVE SPECIAL 


Products & Services

WATER PURIFICATION UNITS

Under the counter Reverse Osmosis Unit

This filtration system offers a thorough purification process through:

1. Sediment Filter: Removes larger particles like sand and rust, protecting subsequent stages from damage.
2. Carbon Filter: Eliminates chlorine, chloramines, pesticides, and organic compounds, enhancing taste, odor, and overall water quality.
3. Reverse Osmosis Membrane: The core stage utilizes a semi-permeable membrane under pressure to remove contaminants like salts, heavy metals, fluoride, bacteria, and viruses.
4. Post-Carbon Filter: Further improves taste and eliminates residual odors or flavors introduced in earlier stages.
5. Final Polishing Filter: The last stage provides additional filtration, ensuring the water is clean and free from remaining impurities.

 

Water Fountain

– Capacity: 20 liters per hour (20L/HR)
– Material: Stainless steel construction

Features:
– Durable and corrosion-resistant
– Easy to maintain and clean
– Suitable for various settings (public spaces, schools, gyms, offices)
– Provides a continuous flow of water
– Hygienic source of drinking water
– Ideal for high-traffic areas

 

 

 

 


Rainfall 

Likelihood of below-average rainfall (shown in orange) in Southern Africa
in December 2023-February 2024.

 

Source: Source: NOAA Climate Prediction Centre

Hydrocon Green Maun Office

  +267 6840259
  John Wilson: john@hydrocon.org
Boitumelo Lebaleng: boitumelo@hydrocon.org